Search found 21 matches
- Fri Nov 03, 2006 12:09 pm
- Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
- Topic: Link Count shows as 0rows/sec when RCP is enabled
- Replies: 4
- Views: 2726
Link Count shows as 0rows/sec when RCP is enabled
Hi... I observed this peculiar behaviour in one of my jobs... I have a DB2 stage in which row leakage is happening. To capture this, I have used a COPY stage and enabled RCP so as to catch the sqlcode and sqlstate of the rows being rejected. The o/p of copy stage is a sequential file. Everything wor...
- Thu May 11, 2006 6:57 am
- Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
- Topic: .csv
- Replies: 10
- Views: 3695
- Thu May 04, 2006 2:13 am
- Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
- Topic: DataStage not returning the return code to Unix
- Replies: 4
- Views: 2022
- Tue May 02, 2006 5:51 am
- Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
- Topic: DataStage not returning the return code to Unix
- Replies: 4
- Views: 2022
DataStage not returning the return code to Unix
Dear all, We are using Unix Shell Scripts as the Wrapper for all our parallel jobs (around 20-25 jobs). Once we trigger the script, when the load is too heavy, it takes around 3 hours for the entire process to finish. We have observed that in such scenarios, after about 2 hours, even though the job ...
- Tue May 02, 2006 5:35 am
- Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
- Topic: Problem in Job Report XML File Creation
- Replies: 4
- Views: 1301
Dear all, Thanks for all the valuable suggestions, result of which I have found out the solution for the problem. :D In our process, once the XML is generated, we are using a Server Job to load the counts into the Database Table used to store these statistics. The link count was sometimes being capt...
- Mon May 01, 2006 7:16 am
- Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
- Topic: Problem in Job Report XML File Creation
- Replies: 4
- Views: 1301
Problem in Job Report XML File Creation
Dear all, I am facing an issue while collecting the job Statistics for a set of jobs. The scenario is like this. When I run a single job, and later generate a XML file for the same job, all the link counts are correct. We are using Unix Shell Scripts as the Wrapper for all our parallel jobs (around ...