Search found 21 matches

by Aparna_A
Fri Nov 03, 2006 12:09 pm
Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
Topic: Link Count shows as 0rows/sec when RCP is enabled
Replies: 4
Views: 2726

Link Count shows as 0rows/sec when RCP is enabled

Hi... I observed this peculiar behaviour in one of my jobs... I have a DB2 stage in which row leakage is happening. To capture this, I have used a COPY stage and enabled RCP so as to catch the sqlcode and sqlstate of the rows being rejected. The o/p of copy stage is a sequential file. Everything wor...
by Aparna_A
Thu May 11, 2006 6:57 am
Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
Topic: .csv
Replies: 10
Views: 3695

Hi,

Just give the extension to the file as .csv, chk tht the Record Delimiter is Comma (thats by default), and final Delimiter is "end" (also by default).

This serves your purpose.
by Aparna_A
Thu May 04, 2006 2:13 am
Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
Topic: DataStage not returning the return code to Unix
Replies: 4
Views: 2022

Hi Sreeni,

Can you pls. elaborate on your suggestion.

When UNIX triggers a DS Job, the control shifts to DataStage, how do I keep sending any Status Codes to UNIX before the Job Running is successful/aborts.
by Aparna_A
Tue May 02, 2006 5:51 am
Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
Topic: DataStage not returning the return code to Unix
Replies: 4
Views: 2022

DataStage not returning the return code to Unix

Dear all, We are using Unix Shell Scripts as the Wrapper for all our parallel jobs (around 20-25 jobs). Once we trigger the script, when the load is too heavy, it takes around 3 hours for the entire process to finish. We have observed that in such scenarios, after about 2 hours, even though the job ...
by Aparna_A
Tue May 02, 2006 5:35 am
Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
Topic: Problem in Job Report XML File Creation
Replies: 4
Views: 1301

Dear all, Thanks for all the valuable suggestions, result of which I have found out the solution for the problem. :D In our process, once the XML is generated, we are using a Server Job to load the counts into the Database Table used to store these statistics. The link count was sometimes being capt...
by Aparna_A
Mon May 01, 2006 7:16 am
Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
Topic: Problem in Job Report XML File Creation
Replies: 4
Views: 1301

Problem in Job Report XML File Creation

Dear all, I am facing an issue while collecting the job Statistics for a set of jobs. The scenario is like this. When I run a single job, and later generate a XML file for the same job, all the link counts are correct. We are using Unix Shell Scripts as the Wrapper for all our parallel jobs (around ...